Saturday, November 8, 2008

Paint...

These are the colors we are looking at to paint the front door. I think we are going with the dark tan/gray color.

Mater bathroom sink

Tile in the laundry room. We had them lay it in the "brick" pattern. I really like it.


This is what the doors will look like in the house.



Kitchen

Kitchen cabinets were starting to be put in.




Front door.




Living room. The paint is a little on the dark side but this picture makes it look darker then what it is.








Addies room. aka happy room. We named her room this because the rest of the house is dark and then you walk towards her room and its so bright because of the pink, but we love it. It is actually a really light pink and then this wall will have dark stripes on it.













more drywall...







The drive way is poured so now we do not have to get our shoes so dirty!



Wednesday, October 22, 2008

The dry wall is up...

Ok so this is not the drywall but it sure is the cutest little girl ever with a very cute grandma!


Addie and Grandma in Addie's bedroom



Hallway to the master bedroom.


Kitchen.







These are pictures of the house with all the brick on it. We are still waiting on siding but the concrete drive way and sidewalk to the house has been poured and hopefully will have more pictures to come.






Sunday, October 12, 2008

More pictures of the brick...




On Saturday we went to see what else was done and well there was a few different things done in the inside of the house but the house was all locked up so we couldn't get in to take pictures. We will work on getting a key so we can get pictures for everyone to see. They are almost done with the brick so I think that will be finished Monday.

Wednesday, October 8, 2008

Tanners...




"Has anyone seen a man with a pumpkin as a face? I can't seem to find him."



Addison loved looking at the goats.




The brick...


They started putting the brick on the house today. This is how it was at 5:30 tonight. I think they will get the rest of the brick put on tomorrow. The only other things that have been done are the duct work for the heating and cooling and the bathtubs are in. We tried to take pictures of that but it is too dark in the house. But hey we all know what those things look like! Today was also a pretty busy day because we finalized the cabinets and Chad and Lisa you will like this, but we are putting a square sink in our master bathroom. Thanks for the idea. Also we were given 6 different books that I feel like are 1000 pages each to look through for all of our lighting. So that will be fun this weekend.

Wednesday, October 1, 2008

The garage door has arrived...

Not much has gone on so far this week, but they did put the garage door in!! Chris was out there today and said that some electrical things have started also. I was told by our designer that on Monday they will start putting the brick on the house and I believe they will have the shingles on by the end of the week.